Specification review for Division 09 flooring packages
Trade specialists map collection SKUs to traffic class, slip resistance coefficient targets, and adhesive or click constraints before drawings freeze. Reviews typically include moisture vapor transmission limits for concrete slabs, expansion gap notes for rigid-core systems, and VOC emissions documentation for FloorScore pathways. Teams receive a concise mark-up that procurement managers can attach to bid packages without rewriting the basis of design. When owners debate natural hardwood character versus engineered LVT consistency, we document both abrasion resistance and maintenance labor so the decision is conscious rather than assumed.